Tuesday, November 25, 2008

Falcon 9 Nine Engine Test



11/22/2008

The full mission duration test firing of the Falcon 9 first stage lasting nearly 3 minutes. The nine Merlin engines produced 855,000 lbs. of thrust and consumed over half a million pounds of liquid oxygen and rocket grade kerosene during the test.

0 Comments:

Post a Comment

<< Home